Project change.
Evaluated, governed, verified.

Portico coordinates and governs change on commercial real estate projects so buildings are delivered and perform as intended.

Every project changes. Few teams see the full impact.

Client requests

Client requirements evolve and scope changes with them.

Value engineering

Costs come in higher than expected and savings are proposed.

Product substitutions

A specified product is discontinued, or its lead time will not hold.

Design deviations

Detail increases and the design moves away from what was assumed.

Record corrections

A ceiling comes down and the structure is not what the records showed.

Requirement uplifts

A regulation is tightened or a target is raised mid-project.

Commissioning deviations

Systems do not achieve their design performance on test.

Operational deviations

The building in use does not perform as it was designed to.

How it Works

Portico evaluates and governs change across the RIBA plan

Architectural plans spread across a work surfaceBaseline model summary
01Baseline

One agreed model of the project

Portico builds a detailed project baseline from architectural drawings, MEP designs, thermal models, cost models and employer's requirements. On existing buildings, Portico engineers survey the site and calibrate the model against it. The baseline holds the agreed position on cost, compliance, building performance and design intent.

Blue glass curtain-walled commercial building facadePortico AI assessing a proposed change to the glazing specification
02Evaluate

Impact analysis for every change

Ask Portico what a change does and get an answer immediately. Every proposal is checked against the cost model and the building regulations, tested against the employer's requirements, and simulated for its effect on energy and carbon. Every decision is made with a full picture of the trade-offs involved.

A construction team in hi-vis and hard hats reviewing drawings together on sitePortico decision record showing an approved change with its evaluated impact and named sign-off
03Govern

Controlled approval and sign-off

Every change is submitted as a proposal and signed off by a named person. Approval routes are agreed at the outset. Each change is reviewed by the disciplines it affects, then approved by the client, with every response held against it. Portico then updates the baseline and notifies every party. Nothing changes the project without a decision on record.

A modern open-plan office interior with people working at desksPortico in-use performance comparing expected and actual energy, cost and compliance metrics after twelve months in operation
04Verify

Calibration of real world performance

Portico's Verify module feeds actual performance data from the building into the baseline model, updating it to reflect how the building actually behaves. Operational changes can then be evaluated before they are made and the building brought into line with the performance it was designed to deliver.

What Portico delivers

Better decisions, better buildings

Nothing changes without a decision

Every change is evaluated against the baseline model before it is approved, so any deviation from what was signed off is seen and deliberately taken, not absorbed.

See risk before it lands

The full impact of a change is visible at the point of decision. Cost overruns, compliance breaches and missed targets are caught before they are committed, not after.

Decide in minutes, not weeks

Evaluation runs the moment a change is proposed, so decisions that once took weeks of consultant back and forth resolve in minutes.

Understand every change

Portico's AI lets any discipline question a change in plain language, so teams align on one shared understanding and spend less time going back and forth.

Keep everyone aligned

Every party works from the same live baseline, so no one is acting on a stale version or reconciling conflicting information.

Govern every decision

Each change is approved by a named person and recorded, giving a defensible account of what changed, when, by whom and why.

Segments

Who Portico is for

Asset owners and managers

  • Assets delivered closer to what was intended
  • An objective record of what changed and why
  • Defensible reporting for owners, funds and lenders
  • In-use performance measured against what assets were designed to deliver

Developers

  • No change approved with its cost unanswered
  • Evidence you can take up the chain
  • Value engineering with the trade-offs visible
  • Proposals for changes arrive with their impact assessed

Main contractors

  • Assess the impact of changes in real time
  • Conflicts found before a change is approved
  • Cost savings with the trade-offs visible
  • A record that proves what was delivered

Professional teams

  • Test a change before proposing it
  • One baseline, shared by every party
  • Question the design directly without waiting on another discipline
  • The full evolution of the project, on record

Every project runs on change. Portico governs it.

Portico works across projects of every size and priority.

  • New build
  • Retrofit
  • Refurbishment
  • Fit-out
  • Decarbonisation
  • Change of use
  • Change of energy status
Credibility

Built from the ground up by engineers who know the problem

Portico was not designed from a research paper or a market analysis. It was built by engineers and consultants who have spent two decades watching the gap open between what was designed, what gets built, and how it performs in use.

  • Two decades of experience across UK commercial real estate
  • Shaped with architects, developers, contractors and asset managers who live these projects
  • Founded by a practising engineering consultancy and tested on live projects
  • Portico engineers survey buildings onsite, so baselines reflect real conditions
  • Built on the RIBA Plan of Work, NRM and Uniclass classification
  • Evaluates against UK Building Regulations, EPC, MEES, CRREM and NABERS UK
Aerial view of a commercial construction site with foundations under way and a tower crane

Every change evaluated. Every decision on record.